Aug 11, 2021
S4 Closeout
- (13 hours)
Category: Fuselage
Continued working on the s4 close-out all day. We cut, drilled, and glued the spacer onto the back of the S4 closeout, continued fitting the plastic. Near the end of the day we drilled the S4 on the bottom side and top through it and the aluminum behind/below. We then attached the nut plates to those aluminum pieces, so the s4 cutout can be screwed into place.